10
0
0

Text complet

(1)

Analysis of Nurse Personnel Requirements Based on Working Load in Installation of Emergency Units, Wamena Regional General

Hospital, Jayawijaya District, Papua

Lenny Grace Hattu1, Amran Razak2, Darmawansyah2, Indar2, Syamsiar S.

Russeng3, Muhammad Syafar4, Muh. Yusri Abadi2

1

Student of the Magister Program in the Department of Health Administration and Policy, Faculty of Public Health, Hasanuddin University, Indonesia

2

Department of Health Administration and Policy, Faculty of Public Health, Hasanuddin University, Indonesia,

3

Department Occupational Health and Safety, Faculty of Public Health, Hasanuddin University, Indonesia

4

Department of Health Promotion and Behavior Science, Faculty of Public Health, Hasanuddin University, Indonesia

Corresponding author email: [email protected]

ABSTRACT

The Wamena Regional General Hospital (RSUD) has never conducted an analysis of the need for nurses in terms of workload. Therefore, a systematic planning method for nurses is needed. This study aims to analyze the number of nurses needed based on the workload in the Emergency Room Installation of RSUD Wamena, Jayawijaya Regency. This research is a qualitative and quantitative research. The method used in this study is the Staff Need Workload Indicator (WISN Method). The population in this study were 24 nurses who worked at the Wamena Regional General Hospital in the Emergency Room installation. The informants in this study consisted of the head of the Emergency Room, the head of the service division, the head of the nursing section. The sampling technique in this research is purposive sampling. The results showed that the workload of nurses in the Emergency Room Installation at RSUD Wamena was relatively light. The availability of nurses is not in accordance with the workload that is borne by each nurse in the Emergency Room Installation of RSUD Wamena. Based on the Workload Indicator Staff Need (WISN) method, the number of nurses in the emergency unit installation is 20 nurses. Suggestions for the hospital to plan the need for nurses that refer to workload analysis for the implementation of good nursing care in order to get a rational number of nurses.

Keywords: workload, Emergency Unit, Nurse, WISN

INTRODUCTION

It is interesting to observe the threats to the free market in the health sector

that we are facing and will face in the global era. The opening of the free market

results in high competition in the health sector(Aziza, 2020).The competition between

public, private and foreign hospitals will be even harder to seize an increasingly free

market. In addition, the community demands that hospitals should be able to provide

(2)

services with the concept of one step quality services. This means that all health care needs and services related to patient needs must be served by the hospital in an easy, fast, accurate, quality manner at affordable costs(Ilyas, 2013).

One important effort to overcome this problem is the ability of hospital leaders to plan HR needs appropriately in accordance with the functions and service workloads of each unit, division and hospital installation(Indar et al., 2020). Hospital HR planning knowledge and skills are competencies that every leader at every level of hospital management must possess. This is because more than 75% of the hospital budget allocation is used for personnel expenditures, so human resource management must become the center of management's attention so that existing human resources can be effective(Hariyati, 2014). In addition, one indicator of the success of an effective and efficient hospital is the availability of sufficient, high-quality, professional human resources in accordance with the functions and duties of each personnel(Bupala, 2015; Olii et al., 2019; Mualiminetal., 2020).

Basically, all formulas or methods that have been developed to calculate hospital personnel requirements are rooted in the workload of personnel(Lestari, 2014). Workload can be measured by the volume or quantity of products or services produced by a medicalpersonnel. The amount of workload for each personnel also determines the level of quality of the services provided. That is, we must determine the optimal load that high quality personnel can handle(Datuan, 2018).

The Wamena Regional General Hospital is a type C owned by the Jayawijaya Regency Government which functions from April 14, 1963, located in Wamena, is a referral hospital from several districts in the central mountains and is registered as an Accredited hospital with the title Main. Based on preliminary data, the number of patient visits has increased in the last three years as evidenced by the increase in the number of outpatient visits, visits to emergency departments and inpatient installations. Outpatient visits in 2017 totaled 33,691 patients, in 2018 there were 44,471 patients and in 2019 totaled 50,023 patients. Meanwhile, the number of inpatient visits in the last three years has also increased with the BOR (Bed Occupation Rate) in 2017 of 63.71% with the highest BOR first in the Internal Medicine room 73.34% and the second in the surgical treatment room 56.35. %. In 2018 it was 76.4% with the highest BOR first in the internal medicine room at 97.81% and the second in the surgical treatment room 80.34%, and in 2019 it was 78.77% with the first highest BOR in the internal medicine room 94, 62% and the second in the surgical treatment room 75.61% with the total number of 198 beds.

The Wamena Regional General Hospital is a referral hospital in the Lapago

area in the central mountains so that the increase in BOR, outpatient visits and

emergency visits is due to the presence of specialist doctors so that patients do not

need to be referred again for treatment at hospitals that have specialist doctors. With

the presence of specialist doctors, it resulted in many patients being treated with a

(3)

more severe degree of severity so that the patient's level of dependence on nurses was higher, the handling procedures were more specific and required more intensive supervision. This is why the nurses at the Wamena Regional General Hospital feel that their workload is getting heavier so that additional personnel are needed. The recruitment of nurses is determined by the Jayawijaya Regency Government. The hospital only proposes the number of personnel. RSUD Wamena currently does not have a standard standard in nursing staff planning. Therefore a nurse planning method is needed that is suitable for the needs of the hospital and can be used as a basis for recruiting the nurses needed by the hospital by the Jayawijaya Regency Government.

METHODS

The research conducted is qualitative and quantitative research. The method used in this study is the Staff Need Workload Indicator (WISN Method). The population in this study were 24 nurses who worked at the Wamena Regional General Hospital in the Emergency Room installation. The informants in this study consisted of the head of the Emergency Room Unit, the head of the service division, the head of the nursing section. The sampling technique in this research is purposive sampling.

This study uses primary data and secondary data. Primary data obtained from interviews and observations for qualitative data. Secondary data were obtained in writing through a review of important documents related to the analysis of the workload of nurses. There are two analysis models used, namely interactive model data analysis and descriptive data analysis

RESULTS

Calculation of HR requirements based on WISN (Work Load Indicator Staff Need)

To calculate the number of nurses needed at the Wamena Hospital Emergency Unit Installation based on the WISN method, 5 steps are needed, namely:

Uptime analysis available

Available working time is a unit of time used by nurses to work in carrying out their main activities for a year. Determining available working time aims to obtain available working time for each category of HR working in the hospital within one year.

Table 1. Analysis of Available Working Time of Implementing Nurses in the Emergency Unit Installation

Code Factor Nursing HR

Category

Description

(4)

Source: Primary Data, 2020.

Based on the table above, it can be seen that the working time available for the nurses at the Wamena Hospital Emergency Unit is 127,920 minutes / year.

Based on the results of interviews related to working time as follows;

"For the Emergency Unit there are 3 shifts, namely morning shift, afternoon shift and night shift, each shift consists of 3, 4 or 5 nurses and 2 days off" (Head of the room with the initials Ns.M.J).

"Our room consists of 3 shifts which are divided into each shift, namely 3 people morning shift, 4 afternoon shift and 5 people night shift, while we usually take 2 days off a week"

(Senior nurse with initials J, A.md.Kep) .

"Leave for each nurse in one year is entitled to 12 working days annual leave" (Head of the room with the initials Ns.M.J).

"So far, we rarely attend trainings (senior nurses with the initials J, A.md.Kep).

"We never get a day off on National holidays or public holidays, or leave together because the Emergency Unit is divided into 3 shifts, especially if there is time off with the outpatient installation on holidays or not providing services. "(Senior nurse with the initials J, A.md.Kep).

"Usually, there are nurses who are suddenly sick and usually notified by telephone or whatshap or permission for sudden affairs, there are even nurses who have absolutely no notification. And usually on the day it is his turn to get a day off, the person concerned will still enter to cover his absence (negligent) ”(Head of the room initials Ns.M.J).

"For our room there are those who do not enter without reason / no notification, usually 3 days" "(Senior nurse with initials J, A.md.Kep).

"The morning shift starts at 08.00 WIB until 14.00 WIB, the afternoon shift starts at 14.00 Wit until 21.00 WIB, while the night shift starts at 21.00 WIB until 08.00 WIB until the end of the operand" (Head of the room with the initials Ns.M.J).

A Working days 312 Day/ year

B Annual leave 12 Day/ year

C Education and

training

2.5 Day/ year

D National holiday 19 Day/ year

E Average absence

from work

12 Day/ year

F Working time 8 Hour/Day

Working days

available

266.5 Working Day/year

Available working

time

2.132 Hour/year

127.920 Minute/year

(5)

Standard Workload Analysis

Workload standard is the volume / quantity of workload for 1 year per HR category. The workload standard for a main activity is arranged based on the time needed to complete it (average time) and the time available per year that is owned by each category of labor.

Table 2. Calculation of Workload Standards in the Emergency Unit Installation

Direct nursing Average Time SBK

Patient TTV 3.8 33663

Accept new patients 3.3 38376

Caring for wounds 21.7 5904

Nebulezer 17 7525

Suction 4 31980

Install the catheter 10.5 12222

Install NGT 6 21320

Sonde 2 63960

IV and IM injection 2.1 61897

ECG 22 5815

Send the patient X-rays 21.7 5904

Install the monitor 19 6733

Put in Pam's infusion 2.9 43609

Post often Pam 2.9 43609

Fluid blance 8.4 15229

Take a basic sample 20.3 6291

Transf the patient to the ward 26.7 4797

Install oxygen 2 63960

Changing intravenous fluids 1.6 79950

Handle DOA patients 1.9 66166

Install the pempers 1.9 66166

Removing the patient's infusion 2.1 59963

Remove the patient catheter 2.1 59963

Remove the patient's NGT 2.1 61897

Removing the monitor 6.5 19580

Remove the filter pam 4.3 29520

Removing Pam's drip 8.9 14319

Preparing the pre op patient 35 3655

Give the patient drinking medication 3.4 37624

Installing vemplon 2.7 46800

Release oxygen 2.4 53300

Helping patients defecating and bladder 3.3 38376 Take care of patient administration /

registration 22 5815

Make a watch report 60 2132

Make Askep 60 2132

Follow the weigh and accept 45 2843

Source: Primary Data, 2020

(6)

Establish Allowance Standards

Allowance standards are activity standards for activities where annual statistics are not recorded regularly (Fiestas Navarreteetal., 2019). Based on in-depth interviews with informants at the Emergency Unit Installation, the allowance standards are meetings (room meetings and coordination meetings) and training.

Table 3. Calculation of the Nurse's Allowance Time in the Emergency Room Installation NO Leeway Factor Average Time Total Leeway

Standard

Leniency standards (related to indirect productive activities)

1 Attend room

meetings

1 hour/month 12 hours/year 0.006 2 Attending the

Coordination meeting

2 hours 0.011

3 Take training 4 hours 0.023

Total Leeway Factor 0.039

Source: Primary Data, 2020

Based on the results of the interview related to the standard of leniency as follows;

"For room meetings are always conducted once a month and coordination meetings are conducted every six months(Head of the room with the initials Ns.M.J).

"If our room meeting is always conducted once a month, while the coordination meeting is always conducted every three months and followed by the head of the room only" (Senior nurse with initials J, A.md.Kep).

Calculation of Human Resources Needs of Work Units

Human Resources Needs = Quantity of Basic Activities + Allowance Standards Workload Standards

With a basic quantity of 210,288 a year, the following calculation of nurse needs in the Installation of Emergency Unit wamena hospital.

Table 4.Calculation of The Needs of Nurses in the Installation of Emergency Units

Direct nursing SBK KS

Patient TTV 33663 0.32

Accept new patients 38376 0.28

Caring for wounds 5904 1.1

Nebulezer 7525 1.08

Suction 31980 0.19

Install the catheter 12222 0.29

Install NGT 21320 0.26

(7)

Sonde 63960 0.11

IV and IM injection 61897 0.19

ECG 5815 1.11

Send the patient X-rays 5904 1.1

Install the monitor 6733 0.73

Put in Pam's infusion 43609 0.15

Post often Pam 43609 0.18

Fluid blance 15229 0.35

Take a basic sample 6291 1.53

Transfer the patient to the ward 4797 1.34

Install oxygen 63960 0.11

Changing intravenous fluids 79950 0.16

Handle DOA patients 66166 0.11

Install the pempers 66166 0.11

Removing the patient's infusion 59963 0.17 Remove the patient catheter 59963 0.12

Remove the patient's NGT 61897 0.11

Removing the monitor 19580 0.28

Remove the filter pam 29520 0.2

Removing Pam's drip 14319 0.37

Preparing the pre op patient 3655 0.89 Give the patient drinking

medication 37624 0.29

Installing vemplon 46800 0.17

Release oxygen 53300 0.09

Helping patients defecating and

bladder 38376 0.16

Take care of patient

administration / registration 5482 1.75

Make a watch report 3337 1.44

Make Askep 1599 2.97

Follow the weigh and accept 4264 1.14

amount 20.92

Desc :SBK : Standard Workload KS :Resource Requirements

From table 4. above, based on the calculation of the need for personnel using WISN, the total need for nurses in the Emergency Unit Installation is 20.92 or 21 nurses.

DISCUSSION

The supply of nurses, both in number and in type, in the Wamena Hospital Emergency Unit Installation according to the Head of Service, Head of the Emergency Unit Installation, seen from the comparison of beds and the availability of personnel, is not in accordance with the workload borne by each officer. Thus, the nurse as needed.

This study uses the Time and Motion Study Technique as a method to measure the workload of nurses. This technique is carried out on all activities carried out by nurses during working hours(A. Indar, Muh. Alwy Arifin, 2020).Nurse activities consist of direct, indirect activities in the Emergency Room at Wamena Hospital which are the workloads of nurses.

(8)

Based on the workload of nurses, the need for nurses is calculated using the Workload Indicator Staff Need (WISN) calculation method.

The workload of nurses is obtained through observation for 24 hours which is divided into 3 shifts, namely the morning shift, afternoon shift and night shift using the Time and Motion Study technique which is observed for all nursing activities(Harni, 2016).

Observation of nurses' activities for 5 days in the Emergency Unit of Wamena Hospital resulted in the total amount of time spent per shift. Thus this study found that the workload in the emergency room. Wamena Hospital is classified as heavy on the morning shift compared to the afternoon shift and night shift. The results showed that overall the percentage of productive nurse activities was greater than that of non-productive nurses, namely 78%.

Calculating the number of nurses needed in the Emergency Unit Installation at Wamena Hospital in using the formula the researcher has to go through 5 steps, namely, the working time available at the Wamena Hospital Emergency Unit Installation in one year is 267 days or 2,132 hours or 127,920 minutes. This means that more available time should be used by nurses to carry out their main activities. The next step in determining the amount of human resource needs is to determine the work unit and category of HR, based on the analysis of the quantity of available personnel(Marwansyah, 2014), (Darmawansyah, 2018), The work unit of the Emergency Unit Installation at Wamena Hospital with the category of HR, namely Implementing Nurses in the Emergency Room, there is a gap between the number of nurses and the number of available beds.

Furthermore, compiling the Workload Standards, it takes the average time for direct nursing activities owned by Wamena Regional Hospital, then calculated by the number of available work time divided by the average activity time, then the results of the Workload Standards for each type of activity in the designated room(Budiono, 2015). After obtaining the nurse workload standard, the next calculation is to determine the allowance standard where the allowance time is the time needed to carry out other activities that are not directly related and very useful for HR. This allowance standard consists of room meetings, coordination meetings, or training in accordance with existing or always implemented situations(Harni, 2016), (Aulia, 2017).

Calculating the number of human resource needs, the excess of nurses in the Emergency Unit Installation is due to the low productivity of nurses, namely 78%, much lower than the optimum productivity according to Ilyas, which is 80%. This low productivity is also caused by the absence of a job description for nurses, so that nurses work only to carry out routine work, which is an abundant job for doctors.

CONCLUSION

The workload of nurses at the Wamena Hospital Emergency Unit is relatively light.

The availability of nurses is not in accordance with the workload that is borne by each nurse in the Emergency Room Installation of RSUD Wamena. Based on the Workload Indicator Staff Need (WISN) method, the number of nurses in the emergency unit installation is 20 nurses. In order to provide optimal service, the nursing section of the Wamena Regional Hospital needs to make a description of the duties of the nurse in order to achieve optimal productivity of nurses so that nursing services can be carried out better.

(9)

REFERENCES

1. Al-Ananbeh, E., & Al-Wahadneh, A. (2020). Experiences of Family Caregivers’

a. Involvement in Treatment Related- Decision-Making in Triadic Health Encounters. Journal of Scientific Research in Medical and Biological Sciences, 1(2), 57-74. https://doi.org/10.47631/jsrmbs.v1i2.36

2. Aulia, M. (2017). Analisis Kebutuhan tenaga keperawatan menggunakan Metode Workload Indicator Staf Need (WISN) di Pelayanan Rawat Inap RSUD dr. Adnaan WD Payakumbuh Tahun 2017. Universitas Sumatera Utara, Medan.

3. Al Khreem, S. M. ., & Al-khadher, M. . (2021). Perceptions of Nurses about a. Medication Errors: A Cross-Sectional Study. Journal of Scientific

Research in Medical and Biological Sciences, 2(1), 30-41.

https://doi.org/10.47631/jsrmbs.v2i1.178

4. Aziza, M., Darmawansyah, I., Arifin, M. A., Russeng, S. S., Yunus, R., & Al Fajrin, M. (2020). Analysis of Ability and Willingness to Pay Patients in Psychiatric Clinics (Special hospital case study in Maluku Province). Medico Legal Update, 20(3), 932-936.

5. Budiono, S. B. P. (2015). Konsep dasar Keperawatan. Jakarta: Bumi Medika.

6. Bupala, M. (2015). Studi Kelayakan Teknis dan Ekonomi Rencana Pembangunan Rumah Sakit Tipe D Pratama di Kecamatan Seririt Kabupaten Buleleng. Universitas Udayana.

7. Datuan, N., Darmawansyah, D., & Daud, A. (2018). The Effect of Health Service Quality on Satisfaction Patients BPJS in General Hospital Haji.

Jurnal Kesehatan Masyarakat Maritim Universitas Hasanuddin, 1(2), 236- 245.

8. Darmawansyah, A. D. (2018). Pengaruh Kualitas Pelayanan Kesehatan Terhadap Kepuasan Pasien Peserta Bpjs Di Rumah Sakit Umum Daerah Haji Makassar. Jurnal Kesehatan Masyarakat Maritim, 3(1), 10.

9. Daulay, F. C. ., Sudiro, S., & Amirah, A. . (2021). Management Analysis of Infection

a. Prevention: Nurses’ Compliance in Implementing Hand Hygiene in the Inventories of Rantauprapat Hospital. Journal of Scientific Research in Medical and Biological Sciences, 2(1), 42-49.

https://doi.org/10.47631/jsrmbs.v2i1.218

10. Hariyati. (2014). Perencanaan Pengembangan dan Utilisasi Tenaga Keperawatan. Jakarta: Raja Grafindo Persada.

11. Harni. (2016). Hubungan Motivasi Perawat dengan Pelaksanaan Metode Tim Keperawatan di ruang Rawat Inap RSUD Provinsi Kepulauan Riau Tanjungpinang. Universitas Andalas.

12. Ilyas, Y. (2013). Perencanaan SDM Rumah Sakit Teori, Metode dan Formula.FKM Uiniversitas Indonesia.

13. Indar, A., Muh. Alwy Arifin. (2020). Etika Penelitian Kesehatan

Masyarakat.Pustaka Pelajar

(10)

14. Indar, M. A. A., Darmawansyah, Nurhayani. (2020). Sengketa Pelayanan Kesehatan dan Jaminan Kesehatan Nasional. Yogyakarta: Celeban Timur UH III/54I.8.

15. Lestari, N. S. a. K., Martha Irene and Mawarni, Atik. (2014). Studi Kelayakan Pendirian Intensive Care Unit (ICU) Ditinjau dari Aspek Manajemen SDM dan Aspek Pasar di Rumah Sakit Islam Nahdlatul Ulama Demak. Universitas Diponegoro Semarang.

16. Fiestas Navarrete, L., Ghislandi, S., Stuckler, D., & Tediosi, F. (2019).

Inequalities in the benefits of national health insurance on financial protection from out-of-pocket payments and access to health services: cross-sectional evidence from Ghana. Health policy and planning, 34(9), 694-705.

17. Marwansyah. (2014). Manajemen Sumber Daya Manusia Edisi Kedua.

Bandung: Alfabeta.

18. Mualimin, M., Nadapdap, T. P., & Deli, D. (2020). Relationship on Leadership Support with Nurser Compliance Identifying Patients in the Implementation of Patient Safety in Datu Beru Central Aceh Regional General Hospital. Journal La Medihealtico, 1(6), 28-37.

19. Olii, M. W., Rivai, F., & Palutturi, S. (2019). Implementasi Manajemen

Risiko Klinis Dan Faktor-Faktor Yang Mempengruhi Pada Rumah Sakit di

Kota Makassar. Jurnal Kesehatan Masyarakat Maritim, 2(2).

Referințe

DOCUMENTE SIMILARE

In the very recent paper [5], Strichartz investigated the behaviour of the arclengths of the graphs Γ(S N (f )) of the partial sums S N (f ) of the Fourier series of a piecewise

Constantin SALAVASTRU Cette œuvre de synthèse sur la conception problématologique, que Michel Meyer propose dans la Collection « Que sais-je » de la prestigieuse PUF, a pour point de

rnetric sþacets X^rbsþectiael,y Y are-NS-isomorþkic, tken the corresþond'ing quoti,ent sþaces læ ønd, lo øre homeomorþhic.. Rernarh

For the quasioperations the interval arithmetic is not inclusion mono- tonic.. \Miss' Berlin ected with inversability of complex ervals) is the scope of the

The Magnetoresistance effect is caused by the double exchange action between Mn 3+ and Mn 4+ ions [13] , The magnetoresistance peak value M RP of reduced samples B2-B4

Key words: Christian philosophy, Catholicism, Protestantism, Orthodoxy, Russian Religious Philosophy, theology, unitotality, apophatics.. Vladimir

National Research Development Institute for Animal Biology and Nutrition (INCDBNA), Calea Bucuresti nr. 1, Balotesti, 077015, Romania.. 2 National Institute of Research and

o In the case of not taking these measures, the imminence of liquidity crisis of the financial- banking system would induce great effort and it would be hard to be sustained by