Chapter 16. Fault Tolerance and Safety Assurance
• Basic Concepts
• Fault Tolerance via RB and NVP
• Safety Assurance Techniques/Strategies
• Summary and Perspectives
QA Alternatives
• Defect and QA:
. Defect: error/fault/failure.
. Defect prevention/removal/containment.
. Map to major QA activities
• Defect prevention:
– Error source removal & error blocking
• Defect removal: Inspection/testing/etc.
• Defect containment — This Chapter:
. Fault tolerance:
local faults 6⇒ system failures.
. Safety assurance: contain failures or
QA and Fault Tolerance
• Fault tolerance as part of QA:
. Duplication: over time or components . High cost, high reliability
. Run-time/dynamic focus
. FT design and implementation
. Complementary to other QA activities
• General idea
. Local faults not lead to system failures . Duplication/redundancy used
. redo ⇒ recovery block (RB) . parallel redundancy
⇒ N version programming (NVP)
• Key reference (Lyu, 1995b):
M.R. Lyu, S/w Fault Tolerance, Wiley, 1995.
FT: Recovery Blocks
• General idea
. Periodic checkpointing
. Problem detection/acceptance test . Exceptions due to in/ex-ternal causes . Rollback (recovery)
. Flow diagram: Fig 16.1 (p.270)
• Research/implementation issues . Checkpoint frequency:
– too often: expensive checkpointing – too rare: expensive recovery
. Smart/incremental checkpointing.
. External disturbance: environment?
. Internal faults: tolerate/correct?
FT: NVP
• NVP: N-Version Programming
• General idea: Fig 16.2 (p.272) . Multiple independent versions . Dynamic voting/decision rule . Correction/recovery?
– p-out-of-n reliability
– in conjunction with RB
– dynamic vs. off-line correction
• Research/implementation issues . How to ensure independence?
. Support environment:
– concurrent execution
– voting/decision algorithms
FT/NVP: Ensure Independence
• Ways to ensure independence:
. People diversity:
type, background, training, teams, etc.
. Process variations
. Technology: methods/tools/PL/etc.
. End result/product:
– design diversity: high potential – implementation diversity: limited
• Ways to ensure design diversity:
. People/teams
. Algorithm/language/data structure . Software development methods
. Tools and environments
. Testing methods and tools (!)
FT/NVP: Development Process
• Programming team independence
. Assumption: P-team independence
⇒ version independence
. Maximize P-team isolation/independence . Mandatory rules (DOs & DON’Ts)
. Controlled communication (see below)
• Use of coordination team . 1 C-team – n P-teams
. Communication via C-team – not P-team to P-team
– protocols and overhead cost . Special training for C-team
• NVP-specific process modifications
FT/NVP: Development Phases
• Pre-process training/organization
• Requirement/specification phases:
. NVP process planning
. Goals, constraints, and possibilities . Diversity as part of requirement
– relation to and trade-off with others – achievable goals under constraints . Diversity specification
. Fault detection/recovery algorithm?
• Design and coding phases:
enforce NVP-process/rules/protocols
FT/NVP: Development Phases
• Testing phases:
. Cross-checking by different versions
— free oracle!
. Focus on fault detection/removal . Focus on individual versions
• Evaluation/acceptance phases:
. How N-versions work together?
. Evidence of diversity/independence?
. NVP system reliability/dependability?
. Modeling/simulation/experiments
• Operational phase:
. Monitoring and quality assurance . NVP-process for modification also
FT and Safety
• Extending FT idea for safety:
. FT: tolerate fault
. Extend: tolerate failure . Safety: accident free
. Weaken error-fault-failure-accident link
• FT in SSE (software safety engineering):
. Too expensive for regular systems
. As hazard reduction technique in SSE . Other related SSE techniques:
– general redundancy
– substitution/choice of modules – barriers and locks
– analysis of FT
What Is Safety?
• Safety: The property of being accident- free for (embedded) software systems.
. Accident: failures with severe consequences . Hazard: condition for accident
. Special case of reliability . Specialized techniques
• Software safety engineering (SSE):
. Hazard identification/analysis techniques . Hazard resolution alternatives
. Safety and risk assessment . Qualitative focus
. Safety and process improvement
Safety Analysis & Improvement
• Hazard analysis:
. Hazard: condition for accident
. Fault trees: (static) logical conditions . Event trees: dynamic sequences
. Combined and other analyses . Generally qualitative
. Related: accident analysis and risk as- sessment
• Hazard resolution
. Hazard elimination . Hazard reduction . Hazard control
. Related: damage reduction
Hazard Analysis: FTA
• Fault tree idea:
. Top event (accident)
. Intermediate events/conditions
. Basic or primary events/conditions . Logical connections
. Form a tree structure
• Elements of a fault tree:
. Nodes: conditions and sub-conditions – terminal vs. no terminal
. Logical relations among sub-conditions – AND, OR, NOT
• Example: Fig. 16.3 (p.276)
Hazard Analysis: FTA
• FTA construction:
. Starts with top event/accident
. Decomposition of events or conditions . Stop when further development not
required or not possible (atomic)
. Focus on controllable events/elements
• Using FTA:
. Hazard identification – logical composition
– (vs. temporal composition in ETA) . Hazard resolution (more later)
– component replacement etc.
– focused safety verification
Hazard Analysis: ETA
• ETA: Why?
. FTA: focus on static analysis – (static) logical conditions . Dynamic aspect of accidents . Timing and temporal relations . Real-time control systems
• Search space/strategy concerns:
. Contrast ETA with FTA:
– FTA: backward search – ETA: forward search
. May yield different path/info.
. ETA provide additional info.
Hazard Analysis: ETA
• Event trees:
. Temporal/cause-effect diagram . (Primary) event and consequences . Stages and (simple) propagation
– not exact time interval
– logical stages and decisions
. Example (Fig 16.4, p.277) vs. FT
• Event tree analysis (ETA):
. Recreate accident sequence/scenario . Critical path analysis
. Used in hazard resolution (more later) – esp. in hazard reduction/control
– e.g. creating barriers
– isolation and containment
Hazard Elimination
• Hazard sources identification ⇒ elimination (Some specific faults prevented or removed.)
• Traditional QA (but with hazard focus):
. Fault prevention activities:
– education/process/technology/etc – formal specification & verification . Fault removal activities:
– rigorous testing/inspection/analyses
• “Safe” design: More specialized techniques:
. Substitution, simplification, decoupling.
. Human error elimination.
. Hazardous material/conditions↓.
Hazard Reduction
• Hazard identification ⇒ reduction
(Some specific system failures prevented or tolerated.)
• Traditional QA (but with hazard focus):
. Fault tolerance . Other redundancy
• “Safe” design: More specialized techniques:
. Creating hazard barriers
. Safety margins and safety constraints . Locking devices
. Reducing hazard likelihood . Minimizing failure probability
Hazard Control
• Hazard identification ⇒ control . Key: failure severity reduction.
. Post-failure actions.
. Failure-accident link weakened.
. Traditional QA: not much, but good design principles may help.
• “Safe” design: More specialized techniques:
. Isolation and containment
. Fail-safe design & hazard scope↓
. Protection system
. More “active” than “passive”
. Similar techniques to hazard reduction, – but focus on post-failure severity↓
vs. pre-failure hazard likelihood↓.
Accident Analysis & Damage Control
• Accident analysis:
. Accident scenario recreation/analysis – possible accidents and damage areas . Generally simpler than hazard analysis . Based on good domain knowledge
(not much software specifics involved)
• Damage reduction or damage control
. Post-accident vs. pre-accident hazard resolution
. Accident severity reduced . Escape route
. Safe abandonment of material/product/etc.
. Device for limiting damages
Software Safety Program (SSP)
• Leveson’s approach (Leveson, 1995)
— Software safety program (SSP)
• Process and technology integration . Limited goals
. Formal verification/inspection based . But restricted to safety risks
. Based on hazard analyses results
. Safety analysis and hazard resolution . Safety verification:
– few things carried over
• In overall development process:
. Safety as part of the requirement
. Safety constraints at different levels/phases . Verification/refinement activities
. Distribution over the whole process
Case Study: PSC for CCSCS
• Object of study and general problems:
. CCSCS: Computer-controlled safety-critical systems.
. Problem: Safety and failure damage.
. (software) reliability models unsuitable:
– assuming large numbers of failures – missing damage information
. Formal verification:
– static vs. dynamic verification
– need systematic assertion derivation
• Prescriptive specification checking:
. Analyze sources of hazard . Derive systematic assertions
TFM: Two-Frame-Model
• TFM: Two-Frame-Model . Physical frame
. Logical frame
. Sensors: physical ⇒ logical . Actuators: logical ⇒ physical . Example: Fig 16.5 (p.280).
• TFM characteristics and comparison:
. Interaction between the two frames
. Nondeterministic state transitions and encoding/decoding functions
. Focuses on symmetry/consistency between the two frames.
Usage of TFM
• Failure/hazard sources and scenarios:
. Hardware/equipment failures.
. Software failures.
. Communication/interface failures.
. Focus on last one, based on empirical evidence.
• Causes of communication/interface hazards:
. Inconsistency between frames.
. Sources of inconsistencies
. Use of prescriptive specifications (PS) . Automatic checking of PS for hazard
prevention
Frame Inconsistencies
• System integrity weaknesses: Major sources of frame inconsistencies in CCSCS.
• Discrete vs. continuous:
. Logical frame: discrete
. Physical frame: mostly continuous . Continuous regularity or validity of
in-/extrapolation
• Total vs. partial functions:
. Logical frame: partial function . Physical frame: total function
. ⇒ coercion, domain/default specs, etc.
Frame Inconsistencies (II)
• Invariants and limits:
. Logical frame: no intrinsic invariant . Physical frame: intrinsic invariant . Special case: physical limit
. ⇒ assertions on boundaries/relations as invariants/limits to check
• Semantic gap:
. Logical frame: image/map of the reality . Physical frame: physical reality
. Syntax vs. semantics in logical frame
• General solution: to derive systematic assertions for each integrity weakness and
Prescriptive Specifications (PS)
• Definition and examples:
. Assertion: desired system behavior.
. Use PS in CCSCS
• PS for CCSCS:
. Address integrity weaknesses . Systematic derivation
. How to check? dynamic/automatic . Applications in case studies
. Effectiveness and completeness
Deriving Specific PS
• Domain prescriptions:
. Address: partial/total function
. Boundary: e.g., upper/lower bounds . Type:
– expected ⇒ normal processing
– unexpected: provide default values or perform exception handling
• Primitive invariants
. Address: lack of intrinsic invariant . Relations based on physical law
. Use TFM-based FTA and ETA to iden- tify entities to check
. e.g., conservation law:
Deriving Specific PS (II)
• Safety assertions:
. Address: physical/safety limits
. Directly from physical/safety limits . Indirect assertions:
– related program variables
– based on TFM-based FTA and ETA
• Image consistency assertions:
. Address: discrete vs. continuous . State or status checking
. Rate checking
Deriving Specific PS (III)
• Entity dependency assertions:
. Address: linkage among components (discrete/continuous and semantic gap) . Functional/relational dependencies
. Operational characteristics according to physical laws
• Temporal dependency assertions:
. Address:
temporal relations among components (discrete/continuous and semantic gap) . Temporal relations/dependencies
. Time delay effect according to physical laws
A Comprehensive Case Study
• Selecting a case study:
. Several case studies performed
. TMI-2: Three Mile Island accident . Simulator of TMI-2 accident
. Seeding and detection of faults
• A simulator with components:
. Digital controller (pseudo-program chart) . Physical system with 4 process variables:
power, temp, pressure, water level . Prescription monitor
. two sets of sensors (1 for the controller and 1 for the monitor) and one set of actuators
Case Study (II)
• Developing PS in the case study:
. Generic assertions (domain etc.) . Specific assertions with examples
• Fault seeding: wide variety of faults . Erroneous input from the user (1-4) . Wrong data types or values (5-7) . Programming errors (8-16)
. Wrong reading of sensors (17-19)
• Result: all detected by prescription monitor by specific PS
Case Study Summary
• Prescriptive specification checking:
. Based on TFM
. Analyze system integrity weaknesses . Derive corresponding assertions or PS . Checking PS for hazard prevention
. Appears to be effective in several case studies
• Future directions and development:
. Apply to realistic applications
. Prescription monitor development:
– performance constraints – quality/reliability of itself?
– usage of independent sets of sensors – Fig 16.6 (p.281)
. Support for PS derivation
Summary and Perspectives
• Software fault tolerance:
. Duplication and redundancy.
. Techniques: RB, NVP, and variations.
. Cost and effectiveness concerns.
• SSE: Augment S/w Eng.
. Analysis to identify hazard . Design for safety
. Safety constraints and verification
. Leveson’s s/w safety program, PSC, etc.
. Cost and application concerns.
• Comparison to other QA: Chapter 17.